Living room project update

This was the [Sketchup] concept:
google sketchup drawing

Here is the progress so far:
2422 South Gaines
I was originally planning to go with a bench/lid, but changed my mind after relocating the heat register.

2422 South Gaines
I built two drawers that slide all the way out of the frame- combined with the cabinet and shelves on each side, it should be very roomy. A big plus for me is having a solid top I can fasten to the frame.

This entry was posted in gaines, general. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *